Across Canada more knowledge of the costs, benefits, design development and sequencing, and supply chain implications of encapsulated mass timber construction (EMTC) is needed. This report compares costs between concrete, steel, and EMTC in 7-12 storey buildings. The study examines building forms in three different climate regions and presents practical approaches to using EMTC structural components and building concepts.
Published title: A Comparative Feasibility Study for Encapsulated Mass Timber Construction: BC Energy Step Code Compliant 7 to 12 Storey Buildings
To download a PDF without charge, visit the BC Housing digital library, Click here
Print on Demand means the publication is printed by Crown Publications only when an order has been received. This publication is not stocked in the warehouse.